翻译以下:急求。

google翻译。。
Analysis of the Yangtze River city of hills grumble to Luoshan ability to change and flood the Three Gorges reservoir operation after the river facing the flood situation, pointed out that the river water level to reduce the city hills grumble is one of effective measures to restore the original river flood discharge capacity, the implementation of paizhou cut-off, dredging and expansion cards cut grumble mainly engineering measures. And to a typical example of paizhou floods before and after the relevant cut-off river water level, water lines and comparative analysis of stage-discharge relationship was demonstrated paizhou bend to reduce the apparent role of the upstream water level and the necessity of the project
文章标签:

本文链接:https://www.u1e.cn/baike/a/dede2f75e29953b2fdda8ae2 [复制]

猜你喜欢

歇后语大全

还没有人回应过